Poll
Question:
Vote for your favorite!
Option 1: bronson
votes: 2
Option 2: anjocoy
votes: 2
Option 3: willgibbonsdesign
votes: 2
Option 4: OK
votes: 2
Option 5: red_orca
votes: 3
Option 6: MartinP
votes: 0
G.Pizzo has choosen thisRC Helicopter for this weeks topic.
Do your best render of it in two hours!
(https://d2t1xqejof9utc.cloudfront.net/screenshots/pics/40b2f8b5fb81785c9eafd2e005993c7d/medium.jpg)
Please go to the following thread for the entire set of rules:
https://www.keyshot.com/forum/index.php/topic,9142.0.html
Download the file from GrabCAD: https://grabcad.com/library/hk-450-rc-helicopter
Happy rendering! :)
Hi,
Here is my render. For marketing brochure.
- Material, lighting, ground plane, IES lighting with KS5, rendering hero view & toon view for CAD style = 1 hour
- Arranging layout and some small editing using PS = 40 minutes
Hope you like it.
Bronson
CAD & Keyshot material set-up- 1hr-15mins, Environment / Motion Blur set up -30 mins - 5 mins render at max samples set at 32 bit
Total time approx - 1Hr 50 mins (give or take 5 mins)
Time Breakdown:
1. Keyshot: Material, Scene, Lighting, Placement: 1h 28m
2. Keyshot: Render: 20m
3. Photoshop: Background and photo filter: 6m
4. Total: 1h 54m
This one was tricky... took a long time applying materials on all those parts -___-
Hello Everyone!!
I had a lot of fun doing this challenge!
time spent:
-a week thinking about what I should do (not counting that part)
-20 minutes in Solidworks fixing the cap of the model (ugly surface) and splitting the surfaces of the cap, and making groups for the motion blur
-15 minutes finding picture and adding radial blur in photoshop
-20 minutes setting up the environment and adding the motion blur
-10 minutes materials
-20 minutes composing the heli's
-15 minutes rendering
-10 minutes photoshop (little depth pass blur and lens effect)
2 hours of fun!
I'm loving the beeeees :D
The beeeees are doing crazy stuff to my head ! Or at least to my eyes :o
KS - Materials, composition, water surface 45min
- colour render 25min
- shadows render 25min
PS - tweaking with layered renders 15min
Found a bit of time.
1:15h for SolidWorks and Keyshot.
Great Results! Really digging what you did with this.
Quote from: red_orca on November 26, 2014, 09:33:31 PM
KS - Materials, composition, water surface 45min
- colour render 25min
- shadows render 25min
PS - tweaking with layered renders 15min
Thanks Will - glad you liked!
...and the winner is red_orca
Congrats! *Fanfare*
@red_orca:
You now have a week to find a model for the next speed render.
When you have found one, please post the link in this thread.
Here we go.
https://grabcad.com/library/pilot-based-pen-1
Chose this as it's got a variety of material opportunities (clear and solid plastics, rubber, metal, ink, labels...) in a fairly mundane object.